Remember to check the element resistance and the insulation resistance of the heating cable/mat at the recommended intervals:
- In the box: Write the values on the warranty card.
- After being laid out: Write the values on the warranty card.
- After being covered: Write the values on the warranty card.
- Record your readings in the installation manual.
- Ensure that all sharp stones and debris are removed from the area where the heating cable will be installed.
- Place the remesh in preparation of the concrete pour.
- Lay the cables/mats according to the plan and fasten them to the remesh or rebar (using plastic zip-lock ties) so that they do not move during the concrete pouring.
- Do NOT allow heating cables to touch, cross, overlap or get bunched up.
![]()
- Do NOT cut or alter the heating cable. Mat tape may be cut, but the heating cable must never be cut. View the video How to Make Turns with mats.
- Heating cable/mats should be spaced at no less than 2-inches center-to-center and no more than 4-inches center-to-center. This also applies to adjacent heating mats.
- Secure the heating cable to the wire mesh or grid using plastic zip ties. Make sure that the cable/mats and the wire mesh are secure so that they will not move or shift when the concrete is being poured.
- The heating cable will need to be positioned 2-inches from the surface of the concrete. Use wire remesh and Mesh-Ups or concrete dobies/chairs to position the heating cable within 2-inches of the surface. The heating cable/mat should never rest on the ground.

- Do not allow heating cable to cross an expansion joint. Control joints are allowable under the following conditions:
The joint is tooled or cut NO deeper than 1¼-inches.
- A 6-inch piece of ¼-inch angle iron is recommended to protect the cable any place where a control joint will pass over it. The heating cable is tightly strapped to the angle iron with plastic zip ties.
- Mark the forms where the angle irons are located to accurately place the control joints.
- The cable must be ¾ to 1-inch below the bottom of the joint. (Do NOT tool joints deeper than 1½ inches. Stay above heating cables.)